ConocoPhillips Coker and Refinery Expansion (CORE) Project

Home    »    Projects    »    Featured Projects    »    CORE Projects

Our Projects

  • Projects by Market
  • Projects by State
  • Featured Projects
    • SRGW Construction Project
    • City Utilities Southwest Unit 2
    • CORE Projects
    • Coker Modification Project

Project Name

CORE Projects

Client

ConocoPhillips (now Phillips 66)

Engineer

Fluor, Jacobs, Bechtel

Location

Wood River, IL

Project Duration

39 months

Completion Date

2011


Cherne was awarded the construction of the Coker and Refinery Expansion (CORE) work in a contract directly with ConocoPhillips. This project was undertaken to handle the heavy crude imported from Canada and to increase the clean product yield to approximately 87%.

The contract scope included the following work which was self-performed by Cherne:

  • Civil, Foundations
  • Equipment Erection
  • Piping
  • Concrete Fireproofing
  • Instrumentation
  • Electrical
  • Insulation
  • Structural Steel Erection

Cherne performed the following work on a subcontract basis:

  • Mass Excavation
  • Pile Installation
  • Rebar Installation
  • Drilled Pier Installation
  • Asphalt Paving
  • Fireproofing
  • Structural Steel Erection
  • Painting
  • Hydro excavation
  • NDE

The overall CORE Project included the following packages:

  • CCU1, CCU2 and DU1 Metallurgy Revamps
  • CCU1 & 2 Consent Decree
  • CCU1 and DU1 Maintenance Turnaround
  • CCU2, ULD1 and HCU Debottleneck
  • DU2 Lube Crude Unit Capital and Restart
  • HCF Revamp and Restart
  • ULD2 Conversion and Restart
  • CGP Gas plant
  • OSBL Consent Decree
  • Hydrogen Plant No. 2
  • Coker Steam Tracing

The projects were completed with an overall Total Recordable Incident Rate (TRIR) of 0.35 and OSHA Lost Time Rate of 0.00.

© 2023 Cherne Contracting Corporation. All Rights Reserved.